Brand Name : | Sussman |
Model Number : | SS-GU |
Certification : | CCC, SGS, ISO9001, CE |
Price : | negotiable |
Payment Terms : | L/C, T/T, Western Union |
Supply Ability : | 11 sets per month |
Delivery Time : | Shipped in 75 working dys after payment |
Roof Gutter Roll Forming Machine
Technical Parameter
Item NO. | Description | Offered Specification |
1.0 | Roll forming machine | |
1.1 | Rolling speed | 0-12 meter per minute |
1.2 | Rolling thickness | 0.3mm--0.8mm |
1.3 | Raw material | Galvanized cold steel sheet |
1.4 | dimension | 4500mm*800mm*1200mm |
1.5 | Effective width | about 60mm |
1.6 | Roller stations | 16 stations |
1.7 | Roller material | 45#forge steel, coated with chrome |
1.8 | Shaft diameter | Φ70mm ,material is 45# forge steel |
1.9 | Transmission | By chain 1 inch |
1.10 | Material of chain | 45# forged steel with quenching, 12A |
1.11 | Material of cutting | Cr12Mov with quench HRC58-62° |
1.12 | Tolerance of cutting | 6m+-1.5mm |
1.13 | Frame | H type steel |
Main Components
No. | Name | Quantity |
1 | 3T passive decoiler | 1 set |
2 | Main roll forming machine | 1 set |
3 | Control box | 1 unit |
4 | Hydraulic station | 1 unit |
5 | Out table | 1 unit |
Roll Forming Machine Working Flow
Decoiler ---- Feeding --- Levelling--- Cutting ---Roll forming--- Run out table
Machine Photo
Loading picture
After-sale Serive
- The seller takes responsibility for installation and
commissioning of the equipment and free training. After machine
arrive the destination, by the request of the buyer , the seller
will provide 1 technical engineer to guide installation and
training , and the buyer should give the technical person with full
cooperated.
- Installation period: about 6 days after the complete preparation
by the buyer such as the foundation and all necessary accessories.
- Training time: about 3 days.
- Before departure of the engineers from seller, the buyer should
pay for installation and commissioning fee 300$/day to the point
account of the seller. The two-way ticket,visa, food, hotel , the
translator and insurance are all should provide by buyer with full
responsibility.
-The seller supply technical data (including forming mould drawing,
electrical elements drawing and equipment drawing etc.)
![]() |